fpml:stubPeriodType
Method to allocate any irregular period remaining after regular periods have been allocated between the effective and termination date.
Element information
Namespace: http://www.fpml.org/FpML-5/confirmation
Schema document: fpml-ird-5-5.xsd
Type: fpml:StubPeriodTypeEnum
Properties: Local, Qualified
Content
Valid value Description ShortInitial If there is a non regular period remaining it is left shorter than the streams calculation period frequency and placed at the start of the stream ShortFinal If there is a non regular period remaining it is left shorter than the streams calculation period frequency and placed at the end of the stream LongInitial If there is a non regular period remaining it is placed at the start of the stream and combined with the adjacent calculation period to give a long first calculation period LongFinal If there is a non regular period remaining it is placed at the end of the stream and combined with the adjacent calculation period to give a long last calculation period
Used in
- Type fpml:CalculationPeriodDates (Element fpml:calculationPeriodDates)
Sample instance
<fpml:stubPeriodType>ShortInitial</fpml:stubPeriodType>